Phase / Progress Inspection

Staged inspections during construction — footing, pre-drywall and final.

At a glance

Base price
$325 per hour
Typical time on site
1.5 – 2 hours per phase
Governing standard
IRC / IBC + approved construction documents
Inspection scopes
1 scope · 4 checkpoints
Category
Residential Inspections

What this inspection covers

A sequence of inspections performed at critical construction milestones while work remains visible. Typically three to five phases: footing and foundation, framing, rough-in mechanical/electrical/plumbing, pre-drywall, and final.

Key inspection points

  • Footing, foundation and waterproofing
  • Framing, connectors, shear and load paths
  • Rough-in MEP prior to concealment
  • Insulation, air sealing and vapour control

How the scope is structured

Once a proposal is approved, these scopes are generated into your project automatically. Each engineer works and signs off one scope at a time, and every checkpoint below becomes a recorded finding with a condition, a severity and photographic evidence.

01

Phase / Progress Inspection — Standard Scope

4 checkpoints

  • Footing, foundation and waterproofing
  • Framing, connectors, shear and load paths
  • Rough-in MEP prior to concealment
  • Insulation, air sealing and vapour control