Phase / Progress Inspection
Staged inspections during construction — footing, pre-drywall and final.
At a glance
- Base price
- $325 per hour
- Typical time on site
- 1.5 – 2 hours per phase
- Governing standard
- IRC / IBC + approved construction documents
- Inspection scopes
- 1 scope · 4 checkpoints
- Category
- Residential Inspections
What this inspection covers
A sequence of inspections performed at critical construction milestones while work remains visible. Typically three to five phases: footing and foundation, framing, rough-in mechanical/electrical/plumbing, pre-drywall, and final.
Key inspection points
- Footing, foundation and waterproofing
- Framing, connectors, shear and load paths
- Rough-in MEP prior to concealment
- Insulation, air sealing and vapour control
How the scope is structured
Once a proposal is approved, these scopes are generated into your project automatically. Each engineer works and signs off one scope at a time, and every checkpoint below becomes a recorded finding with a condition, a severity and photographic evidence.
01
Phase / Progress Inspection — Standard Scope
4 checkpoints
Phase / Progress Inspection — Standard Scope
4 checkpoints
- Footing, foundation and waterproofing
- Framing, connectors, shear and load paths
- Rough-in MEP prior to concealment
- Insulation, air sealing and vapour control
Request a Phase / Progress Inspection
Tell us about the property and your objective. We will return a line-item quote naming every scope, the governing standard, the deliverables and the turnaround — usually within one business day.